| Project 3: Twister Testing Site |
Location: NAM Leermens (Shell/Exxon), Netherlands |
Type: Packaged unit |
|
| Service: Gas Dehydration |
Client: Shell Technology Ventures |
Start-up: 1999 |
|
| Capacity: 3 mln Nm3/d (105MMSCFD) |
Inlet Pressure: 110 barg (1600 psig) |
Module: Single tube configuration |
|
| Project Scope: Deliver a skid-mounted Twister unit with a single tube configuration. Main equipment:
|
|||
| Design: Main equipment: in-house Integration: Stork IBN (Jacobs) |
Procurement: In-house |
||
| Fabrication: Twister tube: in-house Integration: Stork, MCM |
Commissioning: In-house |
||
| Site Installation: By client with Twister supervision assistance |
Project Duration: 10 months |
||
