Experience

B11 – Offshore Malaysia

Project 5:
B11
Location:
Offshore Malaysia
Type:
Equipment Supply
Service:
Gas Dehydration
Client:
Petrona / Shell Sarawak
Start-up:
2003
Capacity:
16 mln Nm3/d (600MMSCFD)
Inlet Pressure:
150 barg (2200 psig)
Module:
Multiple tube configuration
Project Scope:
Engineering support for the total project and supply of the following main items:

  • 14 Twister Tubes
  • 2 Secondary LTX Separators
Design:
Main equipment: Jacobs
Integration: by client (MCC)
Procurement:
In-house
Fabrication:
Twister tube: Tender ongoing
Integration: KNM (Malaysia)
Commissioning:
In-house for Twister process
Site Installation:
By client with Twister supervision assistance
Project Duration:
18 months

b-11.jpg