Experience

NAM Leermens, the Netherlands

Project 3:
Twister Testing Site
Location:
NAM Leermens (Shell/Exxon), Netherlands
Type:
Packaged unit
Service:
Gas Dehydration
Client:
Shell Technology Ventures
Start-up:
1999
Capacity:
3 mln Nm3/d (105MMSCFD)
Inlet Pressure:
110 barg (1600 psig)
Module:
Single tube configuration
Project Scope:
Deliver a skid-mounted Twister unit with a single tube configuration.
Main equipment:

  • Inlet Separator
  • Twister Tube
  • Secondary LTX Separator
  • DCS control system
Design:
Main equipment: in-house
Integration: Stork IBN (Jacobs)
Procurement:
In-house
Fabrication:
Twister tube: in-house
Integration: Stork, MCM
Commissioning:
In-house
Site Installation:
By client with Twister supervision assistance
Project Duration:
10 months

nam-leermens.jpg