| Project 7: Okoloma NAG |
Location: Onshore Nigeria |
Type: Detailed design & Equipment supply |
|
| Project Scope: Engineering support for the total project and design & supply of complete Twister module incorporating six (6) Twister tubes and one (1) Hydrate Separator |
|||
| Service: Chemical-free fuel gas dehydration & HC dewpointing for 970MW power station. |
Client: Shell Petroleum Development Company of Nigeria (SPDC) |
Start-up: August 2008 (planned) |
|
| Capacity: 120MMSCFD |
Design Pressure: 130 barg (1600 psig) Normal Inlet Pressure: 65-80 barg (940-1160 psig) |
Module: Multiple tube configuration |
|
| Module Size: Footprint 4.4 x 4.8 x 12 metres |
Module Weight: 85 tonnes |
||
| Design Technology: TBV (patented) Conceptual Design: TBV / IMPaC Detailed Design: Pietro Fiorentini |
Procurement: TBV / Pietro Fiorentini |
||
Fabrication:
Hydrate Separator: Pietro Fiorentini |
Commissioning: TBV / Pietro Fiorentini |
||
| Site Installation: By client with Twister supervision assistance |
Project Duration: 18 months |
||