| Project 5: B11 |
Location: Offshore Malaysia |
Type: Equipment Supply |
|
| Service: Gas Dehydration |
Client: Petrona / Shell Sarawak |
Start-up: 2003 |
|
| Capacity: 16 mln Nm3/d (600MMSCFD) |
Inlet Pressure: 150 barg (2200 psig) |
Module: Multiple tube configuration |
|
| Project Scope: Engineering support for the total project and supply of the following main items:
|
|||
| Design: Main equipment: Jacobs Integration: by client (MCC) |
Procurement: In-house |
||
| Fabrication: Twister tube: Tender ongoing Integration: KNM (Malaysia) |
Commissioning: In-house for Twister process |
||
| Site Installation: By client with Twister supervision assistance |
Project Duration: 18 months |
||
