| Project 6: Dense Test Phase |
Location: K-Lab Norway |
Type: Equipment Supply |
|
| Service: Gas Dehydration |
Client: TBV/Demo2000 |
Start-up: December 2001 (pending K-Lab Availability) |
|
| Capacity: 1.5 mln Nm3/d (55MMSCFD) |
Inlet Pressure: 150 barg (2200 psig) |
Module: Single tube configuration |
|
| Project Scope: Engineering support for the total project and supply of the following main items:
|
|||
| Design: Main equipment: In-house Integration: K-Lab & TBV |
Procurement: In-house |
||
| Fabrication: Twister tubes: Stork |
Commissioning: In-house for Twister process |
||
| Site Installation: By K-Lab with Twister supervision assistance |
Project Duration: 4 months |
||
