| Project 2: Barendrecht Gas Treatment |
Location: NAM Barendrecht (Shell/Exxon), Netherlands |
Type: Packaged unit |
|
| Service: Gas HC dew pointing |
Client: Shell Technology Ventures |
Start-up: 1999 |
|
| Capacity: 4 mln Nm3/d (140MMSCFD) |
Inlet Pressure: 97 barg (1450 psig) |
Module: Single tube configuration |
|
| Project Scope: Modified and relocated Zuiderveen unit to Barendrecht. Main equipment:
|
|||
| Design: Main equipment: in-house Integration: Stork Engineering (NL) |
Procurement: In-house |
||
| Fabrication: Twister tube: in-house Integration: VSH (NL) |
Commissioning: In-house |
||
| Site Installation: By client with Twister supervision assistance |
Project Duration: 6 months |
||
