| Project 4: Twister Demonstration |
Location: Utorogu, Nigeria |
Type: Packaged unit |
|
| Service: Water & HC dew pointing |
Client: Shell Technology Ventures |
Start-up: 2000 |
|
| Capacity: 1-4 mln Nm3/d (140MMSCFD) |
Inlet Pressure: 115 barg (1650 psig) |
Module: Single tube configuration |
|
| Project Scope: Modified and relocated Barendrecht unit to Nigeria. Main equipment:
|
|||
| Design: Main equipment: in-house Integration: Stork IBN (NL) (Jacobs) |
Procurement: In-house |
||
| Fabrication: Twister tube: in-house Integration: MCS (NL) |
Commissioning: In-house |
||
| Site Installation: By NAM with Twister supervision assistance |
Project Duration: 5 months |
||
